![]() ![]() If you are planning any construction projects, please plan a minimum of two weeks for completion of your application plan review and issuance of the building permit for most construction jobs. They also have the authority to issue fines on persons or properties violating the Town's General By-Laws, Zoning By-Laws and Building Code Regulations. Projects (other than single family dwellings) are required to have Planning Board approval (Site Plan/Special Permit approval).Plot/Site Plan showing location of proposed new building and/or addition.Buildings/Structures over 35,000 cubic feet are required to have original stamp and signature, along with affidavits filled out completely.All questions are required to be answered. Building Permit application filled out completely including contractor information (license/insurance information, etc.).Construction Documents - Initial (DOCX)Īll structural lumber spec sheets (LVLs, I-JOISTS) MUST be stamped by a Massachusetts Engineer or Architect, unless submitted plans are stamped by the same.Īll applications for a building permit are required to be submitted in complete form including the following information:. ![]() The Building Department is responsible for the review, inspection and permitting of new construction and/or alterations to any structures within the Town. **As approved by Town Meeting on : New Zoning By-Law 5.1.6 regarding ground water in relation to construction is now in effect!** **FOR REFERENCE: 75 MIDDLESEX TURNPIKE (BURLINGTON MALL) IS ALSO KNOWN AS 0 BURLINGTON MALL IN VIEWPOINT** CLICK HERE TO SUBMIT ALL PERMITS ONLINE Permits submitted online are processed FIRST and FASTER than paper ANY CHANGE IN GENERAL CONTRACTOR DURING THE APPLICATION PROCESS AND/OR AFTER THE PERMIT HAS BEEN ISSUED, REQUIRES A NEW APPLICATION FROM SAME (a recalculation of fees may apply) ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |